Vercel migration handoff
The owner approved the Axis Praxis modernization and requested Vercel hosting on the Mac. GoDaddy must remain intact until the Vercel deployment is verified and the exact DNS cutover is approved. Do not cancel GoDaddy, transfer the domain, create credentials, expand access, or buy services.
Source and hosting
- Repository: https://github.com/robertjorndorff-collab/axispraxis
- Prepared source branch: audit/modernize-2026-11-02
- Base: 6fdd9c84533cc1ad014c674aba4c5375865adc3a
- Use the exact commit reported by the completed PC handoff; verify it with git rev-parse HEAD.
- Existing GitHub Pages is legacy, main, root. Main was not selected for this preparation push, to avoid an unintended secondary publication.
- Vercel framework preset: Other. Root directory: repository root. Build command: node scripts/build-docs.mjs. Output directory: . (repository root). Install command: leave empty; no dependencies or package installation required.
- vercel.json enables clean URLs. All source assets and generated reference pages are tracked. There are no server functions, environment variables, or secrets needed for this static site.
- Configure the Vercel project to use the prepared branch for the preview. If main is required for production, fast-forward or merge the approved commit intentionally, noting that main also triggers existing GitHub Pages.
Checks on the Mac
Run node scripts/build-docs.mjs, node scripts/validate.mjs, and git diff --check. Deploy the exact approved revision to a Vercel preview. Verify home, /GOVERNANCE, /README, /contact, /docs/ENFORCEMENT, and /archive/README. Check desktop/mobile, skip-link focus, reference links, canonical URL, robots.txt and sitemap.xml. Check generated pages and contact path, not only the homepage.
Contact is a static page directing visitors to Rob's existing professional site. The former GoDaddy form backend has not been migrated or falsely represented as working. Restore a form only after a destination and actual delivery service are verified. No form submission test has been run.
Domain cutover
After preview verification, inspect the actual Vercel domain requirements and current DNS records. Present the exact records and target deployment for cutover approval. Do not guess records or modify DNS merely because site publication was approved. Keep GoDaddy available for rollback. After cutover, verify HTTPS, apex/www behavior, actual live content, and the deployment commit at axispraxis.ai. Until then, do not claim the custom domain is updated.
Technical harness controls remain adoption guidance, not installed or certified security controls.